Braintree High School

The Town of Braintree engaged Huntress Sports to provide the planning, design, public bidding and construction administration associated with the renovation of their existing running track and construction of two new synthetic turf fields at the Braintree High School Campus. The existing 440 yard track was reconfigured to a 400 meter dimension, expanded from six to eight lanes and all provisions of the MIAA and the NFHSS standards were applied in the new design.

Huntress Associates also made recommendations for perimeter drainage and renovation of the exiting field events, including long jump/triple jump, highjump and shotput areas. Also included in the project were ADA compliant upgrades to the existing grandstands and pressbox located at the track and field.


LOCATION: Braintree, Massachusetts

CLIENT: Town of Braintree

SERVICES PROVIDED: Master Planning, Design Development, Construction Documents, Construction Administration